Russia  in  response  to  the  "housing  problem"  need  to  wait  for  twenty  years.  Part  3
  ► Materials
  ► Equipments
  ► Tehnologies
  ► Information
  ► Contact us
  ► Home

 
 Site Search

 

 

 

 
 Information for builders
 

 
 The new articles

Protect the surface of the concrete floor
To protect the concrete floor, which is operated in the normal mode, or is subject to wear in areas with high traffic, there are several ways to protect the surface.
   Comparable ways: their cost, appearance and ability to perform the task to protect.
   In this article, we consider three ways to finish and protect the floor. Each of them has its advantages and disadvantages.
  
   Thin fil...

Finishing compositions based on water glass. Part 3
When used as part of exhaustion moderator comes coagulation and solidification of liquid glass. However, due to the presence in the composition of Portland cement with a finishing time is an increase strength of the coating due to hydration of cement minerals. Thus from colloids formed during the coagulation liquid glass are actively assigned to the water for hydration of cement, a porous media formed tumors filled Portland cement, which leads to...

Finishing compositions based on water glass. Part 2
Studies in Berlin Institute Federal institute for Materials Research and Testing, show that the average density of 1730 kg/m3 brick large proportion of pores having a size in excess of 1 micron is more than 90% [3] and they are responsible for the increased migration of fluids through brickwork.
   Most fully meet these requirements structure obtained by coagulation and water-soluble potassium silicate forming silica with a high sp...

Modernization and repair of self-propelled machines. (3)
Hardening electrolysis BORATING hinge pins and bushings mates working equipment hydraulic excavators EO-4121 (EA-4321) gives an increase in wear resistance 4-6 times compared to the bulk quenching details.
   Taking into account the high wear resistance of brazed blades, hardened sintered alloys (see Table 1), are recommended for carbide knives dumps graders DZ-122 and RS-98, combined machine E-405 based on KAMAZ, for front dumps a t...

Specialized exhibition Architecture. Construction (END)
Mari-lime brick and gas silicate blocks
   JSC "MZSK" produces silicate brick and a half, color (white, yellow, black, red, blue, green, brown).
   For the production of silica brick used quartz sand from quarries near the plant. Limestone enters the factory with Dobryatinskogo deposit Vladimir region. Silicate brick (Table 1) is used for masonry exterior and interior walls of buildings and structures, as well as ...

Geophysical processes primers and security. Part 5
In the center of Moscow can distinguish vertical structure comprising a crashing into the Earth`s crust magma elongated cylinder (Fig. 2) [5]. In the center section marked lack of extensive vertical zone converted waves ("blind spot"), going from the depths of 70-80 km to 7.5 km. Such "blind spots" are characteristic of the earth`s crust with the introduction of monolithic dense mantle rocks such as gabbro, diabase, etc. In such a zone Tashkent e...

Finishing compositions based on water glass. Part 1
The quality of the decoration of buildings for new construction and reconstruction depend not only on their aesthetic, but also the operational parameters, as good-quality finish - a guarantee of durable service basic designs, long maintenance-free operation, the costs for maintenance and care. Traditional binders used for the production of finishing compositions, liquid glass is widely used, but it has some drawback: coatings based on it gaining...

On possible amendments to the equation Griffiths
Griffith presented a picture of destruction allowed to formulate the problem of determining conditions of the beginning of crack propagation and find its general solution.
   As seen from the above schemes, in the process of crack propagation material directly adjacent to it "coasts" unloaded relaxes. This means that the stress and strain it decreases, and the elastic energy stored earlier in this area of ​​the body is re...

Construction skyscrapers - the requirements of modernity. Part 4
The program is a high-rise building in Moscow
   The project is now a high-rise building in Moscow is implemented in two main areas: the construction of business center "Moscow City" and implementation of the program of the Government of Moscow "New Ring of Russia."
   1. Moscow international business center "Moscow - City"
   The project includes the construction of buildings on the territory of abou...

Degree project - beginning of the road. (3)
Given the great diversity of subject matter and content of diplomas in various specialties, the jury is faced with great difficulties in determining the winners - "Who better violinist or a dancer?". Nevertheless, often based on emotional perception and can estimate the relevance and novelty, and the author`s contribution to the thesis project or job. Absolute winners in recent years have been graduates of Rostov CSO GASU St. Petersburg, Nizhny N...

 

 
 Information for builders
 

 

 

 Russia  in  response  to  the  "housing  problem"  need  to  wait  for  twenty  years.  Part  3

Experts predict that in Russia the total demand for housing will be 150 million square feet. m per year. Thus, twenty years later, the housing problem in the country is resolved.
   Separate issue - the price. They will not fall until until the whole complex of measures designed to break the existing order of things on the housing market. GV Boos believes that it will take two years. If everything goes as planned, by the end of 2006, prices will stabilize, but will fluctuate depending on supply and demand.
   Breaking and rebuild, however, have a lot of things. House as known, is on the ground. A land with infrastructure is not enough, so the new home builders strive to squeeze between the old or somewhere nearby. Administrative procedures for obtaining building plots are complex and not transparent: the local authorities is not profitable to do this, because half of the proceeds from the sale money goes to higher budgets. Therefore, officials negotiate directly with the developers: we give you - the earth, you tell us - apartments.
   Mechanism for management of "administrative barriers" partly registered in the new Town Planning Code. If before the developer had to collect 140 signatures of various permits, it is now only 25. Ie access procedure greatly simplified the construction site, and therefore reduced the likelihood of collusion between builders and local officials. There are, however, developers have another difficulty. They would be happy to build more, but need loans. In Bonds - Land. But the banks do not give money, since the land is not owned companies.
   It is difficult to say whether be able to solve these and many other problems in just two years. On the other hand, consumer demand for housing is very high, and not to use this resource would be extremely unwise. Citizens are willing to invest in the construction industry`s own funds, especially as the insertion of money in the future living space - the surest way to maintain and even increase their capital. But individual investors should be able to enjoy long-term loans at reasonable interest rates. With current rates also afford the luxury of 5-7% can population. Simply put, on the agenda of legalization "long" bank rate.
   But even if the above problems will be successfully solved, not the fact that the mortgage will be in Russian media. The explanation is obvious: it is necessary to pay any loan, but especially with interest. The majority of Russian families live more than modest. Them and to the poor will not carry, and even the middle class even more. Thus, without having the right to free housing from the state, millions of our fellow citizens, for objective reasons are not able to take advantage of the constitutional right to housing. What to do?
  
   To be continued.

  .