Public  control  -  the  way  to  improve  safety  urban  development  activities  (5)
  ► Materials
  ► Equipments
  ► Tehnologies
  ► Information
  ► Contact us
  ► Home

 
 Site Search

 

 

 

 
 Information for builders
 

 
 The new articles

Protect the surface of the concrete floor
To protect the concrete floor, which is operated in the normal mode, or is subject to wear in areas with high traffic, there are several ways to protect the surface.
   Comparable ways: their cost, appearance and ability to perform the task to protect.
   In this article, we consider three ways to finish and protect the floor. Each of them has its advantages and disadvantages.
  
   Thin fil...

Finishing compositions based on water glass. Part 3
When used as part of exhaustion moderator comes coagulation and solidification of liquid glass. However, due to the presence in the composition of Portland cement with a finishing time is an increase strength of the coating due to hydration of cement minerals. Thus from colloids formed during the coagulation liquid glass are actively assigned to the water for hydration of cement, a porous media formed tumors filled Portland cement, which leads to...

Finishing compositions based on water glass. Part 2
Studies in Berlin Institute Federal institute for Materials Research and Testing, show that the average density of 1730 kg/m3 brick large proportion of pores having a size in excess of 1 micron is more than 90% [3] and they are responsible for the increased migration of fluids through brickwork.
   Most fully meet these requirements structure obtained by coagulation and water-soluble potassium silicate forming silica with a high sp...

Modernization and repair of self-propelled machines. (3)
Hardening electrolysis BORATING hinge pins and bushings mates working equipment hydraulic excavators EO-4121 (EA-4321) gives an increase in wear resistance 4-6 times compared to the bulk quenching details.
   Taking into account the high wear resistance of brazed blades, hardened sintered alloys (see Table 1), are recommended for carbide knives dumps graders DZ-122 and RS-98, combined machine E-405 based on KAMAZ, for front dumps a t...

Specialized exhibition Architecture. Construction (END)
Mari-lime brick and gas silicate blocks
   JSC "MZSK" produces silicate brick and a half, color (white, yellow, black, red, blue, green, brown).
   For the production of silica brick used quartz sand from quarries near the plant. Limestone enters the factory with Dobryatinskogo deposit Vladimir region. Silicate brick (Table 1) is used for masonry exterior and interior walls of buildings and structures, as well as ...

Geophysical processes primers and security. Part 5
In the center of Moscow can distinguish vertical structure comprising a crashing into the Earth`s crust magma elongated cylinder (Fig. 2) [5]. In the center section marked lack of extensive vertical zone converted waves ("blind spot"), going from the depths of 70-80 km to 7.5 km. Such "blind spots" are characteristic of the earth`s crust with the introduction of monolithic dense mantle rocks such as gabbro, diabase, etc. In such a zone Tashkent e...

Finishing compositions based on water glass. Part 1
The quality of the decoration of buildings for new construction and reconstruction depend not only on their aesthetic, but also the operational parameters, as good-quality finish - a guarantee of durable service basic designs, long maintenance-free operation, the costs for maintenance and care. Traditional binders used for the production of finishing compositions, liquid glass is widely used, but it has some drawback: coatings based on it gaining...

On possible amendments to the equation Griffiths
Griffith presented a picture of destruction allowed to formulate the problem of determining conditions of the beginning of crack propagation and find its general solution.
   As seen from the above schemes, in the process of crack propagation material directly adjacent to it "coasts" unloaded relaxes. This means that the stress and strain it decreases, and the elastic energy stored earlier in this area of ​​the body is re...

Construction skyscrapers - the requirements of modernity. Part 4
The program is a high-rise building in Moscow
   The project is now a high-rise building in Moscow is implemented in two main areas: the construction of business center "Moscow City" and implementation of the program of the Government of Moscow "New Ring of Russia."
   1. Moscow international business center "Moscow - City"
   The project includes the construction of buildings on the territory of abou...

Degree project - beginning of the road. (3)
Given the great diversity of subject matter and content of diplomas in various specialties, the jury is faced with great difficulties in determining the winners - "Who better violinist or a dancer?". Nevertheless, often based on emotional perception and can estimate the relevance and novelty, and the author`s contribution to the thesis project or job. Absolute winners in recent years have been graduates of Rostov CSO GASU St. Petersburg, Nizhny N...

 

 
 Information for builders
 

 

 

 Public  control  -  the  way  to  improve  safety  urban  development  activities  (5)

It is assumed that the Public Chamber will be the right conclusion on bills similar to that of the Government, as well as the right to a presentation by the Public Chamber of the deputies of both chambers of the Federal Assembly.
   Another feature of the Public Chamber is to control the activities of the executive power, and not only through the community councils that exist within ministries and agencies, but also the first time through direct participation by representatives of the Chamber in boards of all departments, including the police.
   Empowering the Public Chamber functions such should turn it into a system of public control authority.
   In legal relations arising between the public and public control, there is a dualism.
   On the one hand, state control and supervision bodies and public control should interact with each other to solve the general problem: balancing the state, public and private interests in this sphere.
   On the other hand, the public authorities exercise control public examination of project documentation, the results of which may be contrary to the results of public examinations.
   In this regard, to improve the efficiency of cooperation between state and public control mechanism may be used "checks and balances".
   For example, the mechanism of checks and balances in the exercise of examination planning documentation can be realized as follows. If the results of the examination of the state urban development activities inconsistent with the findings of public examination, should be established conciliation commission of representatives of state and public control, which is developing a joint decision on the subject of disagreement.
  
   Findings
   1. In order to create the legal framework of urban planning activities of the Federation should develop a federal law on the division of powers in this sphere between the federal center and the subjects of the Federation.
   2. These acts necessary to provide the conditions and procedure of temporary withdrawal and cancellation of their enforcement powers to deal with offenses in this area.
   3. Given the duality relations between the public and public control in future legislation should include rules that confer powers backbone Public Chamber public oversight body. Giving public authority control authority in this sphere should be the Public Chamber.

  .